NK-37-1 with the chamber of conclusive incineration of fuel in front of the power turbine – there is the most convenient way of modernization of electric stations
- Authors: Nikishin V.A.1, Peshkov L.I.1, Sheludko L.P.1
-
Affiliations:
- ОАО «СКБМ», ООО «Самара-Авиагаз»
- Issue: Vol 5, No 2-2 (2006): Special Issue
- Pages: 189-193
- Section: TECHNICAL SCIENCES
- URL: https://journals.ssau.ru/vestnik/article/view/407
- DOI: https://doi.org/10.18287/2541-7533-2006-0-2-2(10)-189-193
- ID: 407
Cite item
Full Text
Abstract
Here is taken the analysis of the most efficient ways of the development of thermal power plants and regional electric stations in particular. There is shown the most convenient way of modernization of electric stations according to the vapour gas scheme on the basis of the developed energetic gas turbine plants НК–37-1, which is provided with the chamber of conclusive incineration of fuel in front of the power turbine and with the steam boilers making recovery and generating steam for turbine units of the electric station.
In the article also emphasized that using the developed gas turbine plants comparing to НК – 37-1conduces to increase electric power to 10 MW.
In the article also emphasized that using the developed gas turbine plants comparing to НК – 37-1conduces to increase electric power to 10 MW.
About the authors
V. A. Nikishin
ОАО «СКБМ», ООО «Самара-Авиагаз»
Author for correspondence.
Email: sadohina@ssau.ru
Russian Federation
L. I. Peshkov
ОАО «СКБМ», ООО «Самара-Авиагаз»
Email: sadohina@ssau.ru
Russian Federation
L. P. Sheludko
ОАО «СКБМ», ООО «Самара-Авиагаз»
Email: sadohina@ssau.ru
Russian Federation