Full-scale tests of superloaded thrust bearings for hydraulicturbine generators of Sibir hydroelectric power stations of the new generation with unit power of 1 million kw
- Authors: Baiborodov Y.I.1
-
Affiliations:
- Samara State Aerospace University
- Issue: Vol 8, No 4 (2009)
- Pages: 80-87
- Section: MECHANICAL ENGINEERING AND POWER ENGINEERING
- URL: https://journals.ssau.ru/vestnik/article/view/837
- DOI: https://doi.org/10.18287/2541-7533-2009-0-4(20)-80-87
- ID: 837
Cite item
Full Text
Abstract
The paper presents the results of full-scale tests of elastic metal-plastic (EMP) segments at the unit load of 10.0 MPa that can take place in hydroelectric units of the new generation with unit power of 1 million kw at large hydroelectric power stations which are planned to be built in Sibir.
Keywords
About the authors
Yu. I. Baiborodov
Samara State Aerospace University
Author for correspondence.
Email: byui@ssau.ru
Russian Federation