Full-scale tests of superloaded thrust bearings for hydraulicturbine generators of Sibir hydroelectric power stations of the new generation with unit power of 1 million kw

Cover Page

Cite item

Full Text

Abstract

The paper presents the results of full-scale tests of elastic metal-plastic (EMP) segments at the unit load of 10.0 MPa that can take place in hydroelectric units of the new generation with unit power of 1 million kw at large hydroelectric power stations which are planned to be built in Sibir.